Chapter 033 min read

For safety officersSafety during dry ice blasting works.

Technician in full protective equipment during blasting
Deployment in protective equipment · Photo: Egger PowAir Cleaning
SCC
certified
ISO45001
Occupational health and safety certified
0
Solvents
6
Points before every sign-off

Short answer

Before a dry ice deployment is signed off in the plant, the safety officer asks about gas, noise, and protective equipment. Here are the answers to forward.

As of November 2026

01

CO₂, noise, protection. The first questions.

01.1

CO₂ in enclosed spaces

Dry ice is solid carbon dioxide, a colourless, tasteless, and odourless gas naturally present in the atmosphere. In confined, poorly ventilated spaces, ventilation and measurement are required.

Ventilation
CO₂ is heavier than air and collects in low-lying areas. Ventilation and cordoning-off are defined in advance with the safety officer.
Measurement
Continuous residual oxygen measurement with a gas detector, CO₂ measurement upon completion.
01.2

Noise and hearing protection

The jet is loud. The Egger PowAir team works in protective equipment with hearing protection.

Noise level
approx. 85 dB at 7 bar, approx. 95 dB at 10 bar compressed air
Distance
Particle flight approx. 3 to 5 m, the area is cordoned off
01.3

Explosion protection

In dusty areas, such as with wood or aluminium dust, the deployment is coordinated in advance with the safety officer.

Ex zones
Prior coordination, equipotential bonding against static charge is provided by the plant operator
01.4

Food, IFS, HACCP

Dry, without chemicals, and without secondary waste. According to Cold Jet, the process decontaminates surfaces. Proof of cleaning for the audit is documented.

Verification
Delivery note, countersigned daily, plus photographic documentation
02

Safer than angle grinders and solvents.

Conventionally, many workers use angle grinders inside the plant, close to residues and dust. Dry ice replaces this and works without hazardous solvents, scrapers, and chisels.

  • No solvents, no chemicals, no hazardous waste from blasting media
  • No water on electrical installations
  • Blasted-off substances are enclosed and extracted
  • Team with protective equipment, Egger PowAir is SCC-certified and certified to ISO 45001
03

Checklist for sign-off.

Egger PowAir clarifies these points with the plant operator prior to every deployment. Available as a PDF to forward to the safety officer.

  1. Room and ventilationSize, air exchange, CO₂ measurement
  2. Cordoning-off and noiseArea, hearing protection for third parties
  3. Power and plant statusongoing operation or standstill
  4. Dusts and explosion protectionZones, grounding, extraction
  5. Removed substancesToxic substance information, disposal
  6. Compressed air and setup locationCompressor on site or brought along
Checklist as PDF