
- 4Man-days
- instead of 15 to 30 for fire remediation
- < 2h
- instead of 20 to 30 h on the dryer
- 25+
- Years of experience in the team
Short answer
An all-inclusive hourly rate per team, travel included, from 8 hours. What is included is openly stated here. The exact price is provided after the site inspection, in writing.
As of November 2026
How billing works.
Billing is based on an all-inclusive hourly rate per team: staff, travel to and from the site, fuel, energy, insurance, protective equipment, dry ice, machinery, catering and accommodation. Not included are access platforms, enclosure, extraction and the disposal of the removed material. Nights, weekends and public holidays by arrangement. The exact price is provided after the site inspection, in writing and net.
What the price depends on.
Soot detaches differently from a 3 cm thick bitumen layer. That is why we bill according to actual hours and state the price range in advance.
- Contamination and surface areaType, thickness and area determine the duration.
- Access and enclosureBlasted-off substances are captured and extracted.
- Time windowAt night, at weekends or during ongoing operations.
- DisposalOnly the removed material, no blasting media.
- TravelFrom Innerschwand am Mondsee, Europe-wide.
Where money is saved.
Time, not the daily rate, is the deciding factor. Two practical examples.
Rent equipment or commission?
A rented machine is only part of the costs. Who bears what, at a glance.
| Cost item | Rent equipment | Commission Egger PowAir |
|---|---|---|
| Blasting unit | Rental | included |
| Dry ice | Purchase and storage | included |
| Compressed air and compressor | own or rented compressor | included, compressors up to 24 bar |
| Staff and experience | own staff, training | Team with over 25 years of experience |
| protective equipment | provide yourself | included |
| Enclosure and extraction | organise yourself | included |
| Result and liability | with the operating company | with the service provider |